Screen 01 of 11 · Monitoring and Evidence

Monitoring

The latest verdict of every automated check across production, codebase and pipeline, with the pass rate and when the checks last ran.

Who Anyone signed in except an auditor

Route /monitoringFor Signed in
The latest verdict of every automated check, what changed in the last few days, and how the organisation divides across passed, failed, error, inconclusive and no data.
The latest verdict of every automated check, what changed in the last few days, and how the organisation divides across passed, failed, error, inconclusive and no data.
  1. When the checks last ran. Every enabled check is re-graded on a 24-hour schedule and after each connection sync, and an admin can start a run here without waiting.
  2. The whole catalogue. Opens every check the platform holds, including the ones no connected tool can feed yet.
  3. What changed, and when. A check that started failing, one that recovered, and one whose assurance was lost because it can no longer be evaluated at all.
  4. Take a check out. A disabled check keeps its history, its findings and its exclusions, but stops being graded and drops out of every count above.
Flow

What one run of the checks leaves behind

Wider than this screen: swipe sideways across the flow to follow it.

A run starts on a schedule, after a connection sync, after an exclusion changes, or when an admin clicks Run tests. Every enabled check is then graded against the resources already collected, producing one result per check. That result opens or closes a finding for each failing resource and files evidence for each passing check, both of which feed a recalculation of control and framework readiness. Checks that changed verdict are listed as Started failing or Recovered.

The latest verdict of every automated check, split into Production, Codebase and Pipeline. Above the tabs: the Continuous checks bar with Last full run and Run tests, Results are out of date when the checks are behind, Overrides in effect when anything is disabled, excluded or accepted, and the Pass rate chart. Production adds Recent activity and the Result summary.

In Monitoring and Evidence

Tasks on this screen

See how every check is doingLive

One place for the latest verdict of every automated check, grouped by surface, with what changed recently.

As a member

  1. Open Compliance, then Monitoring. The Continuous checks bar says when the checks last ran in full, as Last full run and a time.
  2. If your connections synced data the checks have not graded yet, Results are out of date says so, with the time of the last full run and of the newer data. Results update on their own once the checks catch up.
  3. Overrides in effect appears when anything changes what checks report: checks disabled (and how many still count as failing), resources excluded, findings accepted, and device records moved between Devices and Infrastructure. Show disabled checks lists each disabled check with who, when and why.
  4. Pass rate charts the share of checks with a verdict that passed, per day, over 30D, 90D, 180D or 360D, with the latest rate and its change in points.
  5. Pick a tab: Production, Codebase or Pipeline. The tab is kept in the address, so you can share the view.
  6. On Production, Recent activity lists the last eight changes as Started failing, Recovered, Assurance lost, Passes with accepted failures or Passes after a scope change. Result summary is a donut of Passed, Failed, Error, Inconclusive and No data, with how many checks are monitored and the mean time to remediation.
  7. The table lists every automated check with its category, the tools that feed it, its result, its failing resource count and whether it is enabled. The Result header and the Result filter each have an ⓘ that says what the results mean.
  8. Click a row to expand it: a plain sentence about the result, the failing resources, the stored record, and an AI review panel. A run that graded nothing reads "This run had nothing to grade, so it is neither a pass nor a fail." with the reason. On a phone, tapping a check card opens the same explanation under it.

As an admin

  1. Same as a member, plus the Status cell becomes an Enabled and Disabled control you can click. See Turn a check off.
  2. Run tests works. See Run the checks.
  3. On the Pipeline tab, click Refresh from latest sync to rebuild the pipeline list from the most recent GitHub sync, and set Gate and scan age for infrastructure-as-code scans.

Rules that apply

  • A disabled check stays in the table but is left out of the donut, the pass rate and the tiles. Readiness is a different number: a check that was failing when it was disabled keeps counting as failing there, and Overrides in effect says how many do.
  • Rows are ordered failing first, then errored, then passing, so what needs attention is at the top.
  • Manual reviewer checks are not in Monitoring. They are verdicts a person records, not continuous checks.
  • Only Pass and Fail can change your score. Error means a fault in the check itself, not a missing permission. Not assessed counts as Inconclusive, and Not applicable and Pending count as No data.
  • A run that graded nothing is labelled by why. Not applicable: no connected tool feeds the check, nothing it reads is in its scope, or your team excluded everything it covers. No data: a sync did not complete cleanly, or a connected tool reported nothing of that kind. Pending: the check has never run.
  • The same recorded reason is shown everywhere the result is: in the row's tooltip and expanded row, on the check page, on the connection page, on the control page and on the dashboard. For example "It reads Amazon Web Services, which is not connected." or "Not checked: the last sync of Okta did not complete cleanly." A check for a tool you do not use needs nothing from you.
  • A pass older than Passing results expire after (days) in Settings, 30 days by default, counts as a failure in scoring, while Monitoring keeps showing the raw verdict.
  • Pass rate leaves out checks with no verdict that day and lists them in the tooltip. Days during a pause in checks are shaded and noted. With no history yet it reads "No daily history yet. A snapshot of every check is taken each day, so the line starts tomorrow."
  • A pass reached only because failures were accepted reads Passes with accepted failures, never Recovered.
  • Mean time to remediation reads "Not enough data yet" until one check has failed and then passed again.
  • Some newer checks run and show in Monitoring but count toward no score for now: the AWS Backup, RDS, GuardDuty, Security Hub and S3 Object Lock checks, the Azure backup vault checks, and the exposure checks for open admin ports, Systems Manager coverage and patching, Inspector findings, unused IAM credentials, EDR on every laptop and Google less secure apps.

This task in Monitoring and Evidence

Run the checksLive

Grade the enabled checks against the resources your connections have already collected.

As a member

  1. The Run tests button is on screen for everyone, but pressing it as a member gives an error. Only an admin can start a run.
  2. While a run is going you can watch it. The bar updates every second and a half and says how many checks are done.
  3. Ask an admin to run the checks, or wait. They run on their own after every connection sync and at least once a day.

As an admin

  1. Click Run tests in the Continuous checks bar. The run is queued for the whole organisation.
  2. The bar reads "Starting the run...", then "Evaluating" a count of the checks done so far, with a progress fill.
  3. When it finishes the page reloads and the toast reads "Tests finished; results and scores are updating".
  4. If the run does not finish, the bar says why instead of going quiet: checks are delayed for your organisation, the run has not started after 2 minutes and stays queued, or it is taking longer than usual. You do not need to press Run tests again.
  5. To grade one check on its own, open it and click Test now. It answers straight away with the verdict and the counts it graded.
  6. Test now is disabled on a check that is turned off, and is not shown on a manual check.

Rules that apply

  • Checks also run without anyone asking: after every connection sync, at least once a day, after an exclusion is added or removed, after a finding is triaged, and after a reviewer records a verdict. The Trigger column on a check's History tab says why each run happened.
  • Results count as out of date when data a connection synced has waited 30 minutes without a full run of the checks, or when no full run has finished for 26 hours. Monitoring, a check's page, a connection's page and the dashboard all say so the same way.
  • Test now grades the resources already collected. It does not fetch anything new from the provider, and it does not touch your other checks.
  • One run at a time per organisation. Pressing Run tests while a run is queued does not start a second one.
  • A check with nothing to grade does not quietly pass. It reports No data and says what it needs.
  • A check that hits a fault records Error. It is never counted as a pass.
  • Scoring treats a pass older than your organisation's result lifetime as stale, while Monitoring keeps showing the raw verdict. The two can disagree, by design.

This task in Monitoring and Evidence

See every override on a checkLive

One record of everything that changed what a check reports without changing your resources.

As a member

  1. Open a check and click its last tab, Overrides.
  2. Filter on All, Check, Exclusions or Findings. The device checks add Devices.
  3. Each event names what happened, such as Check disabled, Check enabled, Resource excluded, Exclusion changed, Resource put back, Exclusion expired, Finding triaged, Finding reopened, Triage expired, Triage ended, Device moved to Infrastructure or Device moved to Devices, with who, why, when and until when.
  4. Click Load older events to page back.

As an admin

  1. Same as a member. Nothing on this tab can be edited or deleted, by anyone.

Rules that apply

  • Every override is also written to the audit log. Expiries are recorded by the system.
  • With nothing on record the tab reads "No overrides on record".
  • If the history cannot be loaded, the tab says so and asks you to treat the overrides as unknown, not as none.
  • On Monitoring, Overrides in effect sums these up across the organisation. If it cannot load, it says so rather than showing no overrides.

This task in Monitoring and Evidence

The older Tests pageLive

An earlier results view, titled Continuous tests. It is not in the menu, but the dashboard Quick Start step Run continuous tests links to it.

As a member

  1. Read the donut and the four tiles: Passing, Failing, Not assessed and No data. Each label, the Result header and the Pass / Fail / N/A headers have an ⓘ.
  2. Run tests is on screen for everyone. As a member it shows an error and nothing runs.
  3. For filters, findings and history, open Monitoring.

As an admin

  1. Run tests queues a run for the whole organisation, and the toast reads "Test run queued. Results appear as each check finishes."

Rules that apply

  • The page counts every enabled check, manual ones included, so its numbers can differ from Monitoring.
  • Failing includes errors, and No data counts the checks labelled Not applicable, No data or Pending.
  • Pass, Fail and N/A count resources, not checks. N/A is a resource the run could not grade, and it never counts as a failure.

This task in Monitoring and Evidence

5 questions

Questions about this screen

What do Pass, Fail, Error, Inconclusive and No data mean in Audix Monitoring?

Pass means the latest run met the requirement and Fail means it found something to fix, and only these two can change your score. Error is a fault in the check itself, not a missing permission. Inconclusive (shown as Not assessed) means the check found resources but could not decide. No data gathers the runs that graded nothing, shown as Not applicable, No data or Pending, each with the reason.

Why does Monitoring say Results are out of date?

Your connections synced data the checks have not run on yet, or no full run of the checks has finished for a while. The notice appears when synced data has waited 30 minutes without a full run, or when 26 hours pass without one. Results update on their own once the checks catch up, so you do not need to press Run tests again.

Who can run the checks in Monitoring?

Only an admin can start a run with Run tests or grade one check with Test now, and a member who presses Run tests gets an error. The checks also run on their own after every connection sync and at least once a day.

How long does a passing result count toward my score?

A pass counts until it is older than Passing results expire after (days) in Settings, 30 days by default. After that, scoring treats it as a failure, while Monitoring keeps showing the raw verdict. A manual reviewer's pass ages out the same way, because nothing re-runs it until a reviewer records a new verdict.

What is the difference between Not applicable, No data and Pending on a check?

All three mean the check graded nothing, so none of them moves your score. Not applicable: no connected tool feeds it, nothing it reads is in its scope, or your team excluded everything it covers. No data: a sync did not complete cleanly, or a connected tool reported nothing of that kind. Pending: it has never run. Hover the label or open the row for the reason.